SCT
SR building Info:
EDMS documents related to SR1 (specifications, schedules, presentations etc)
Updated proposal for layout in SR1 for
preliminary schedule
preliminary components
for readout/supply
updated space sharing in 2003-4
in SR1 assembly and test area (SCT,TRT)
proposal to be discussed for space sharing
Technical specification for the SR building:
Update on SR
status (20/8/01) , doc1doc2xls1xls2
Prag SCT week 06/01:
OLDER information:
Further electrical tests on KB module
First test results of the assembled KB test module
Characterization of hybrid B048test and check of module dimension and possible integration scenarios
brief integration meeting minutes and related tasks
very approximate list time estimates
Post
irradiation/annealing measurement on barrel module
Measurement of chip speed on irradiated barrel and forward modules
Pulse shapes for irradiated forward module, barel module and hybrid
ABCD3T K3_168 characterization
Noise Tests in the system test
ABCD3T K3_170 characterization at T=-5
Voltage drops on Atlas SCT power cables (updated 30/9/01)
cable connections, voltage drops and space problem
Thick Concentional Cable prototyping
Very Thin Concentional Cable prototyping
First performance results of the Phobos silicon detectors ( ppt ps files)
Contact:
CERN Div. EP
Bat. 301-1-104
CH-1211 Geneve 23, Switzerland
phone: +41 22 767 5847
fax: +41 22 767 7150 heinz.pernegger@cern.ch