Rack heat exchangers are installed in all watercooled racks
|
Rack heat exchangers are installed in all watercooled racks
|
Rack ventilation units are prepared to be fitted with DCS temperature sensors
|
Rack cooling manifolds installed and connected to heat exchangers
|
Rack cooling manifolds installed and connected to heat exchangers
|
All supports installed in rack area
|
cable trays from rack row 1 and 2 to test area
|
feedthrough of pixel and TRT services from rack area to test and assembly area
|
cable trays from rack row 1 and 2 to test area
|
overhead support of services and trays
|
SCT feed through to test area
|
PIX and TRT trays entering the test area (from inside
|
cable trays support beam installation in SR1
|
installation of cable trays across test area
|