1.) Move to SR1
Discussed the move of SCT/PIX/TRT to SR1
SCT: see transparencies; the proposed position has to be aligned
with TRT needs and building contraints (position of air-diffusers, AC
outlets) and maximum cable length of SCT cables
TRT: still need more detailed inventory of equipment to be
moved to SR1 soon together with a desired floor plan (see actions)
PIX: require space for the ITT (3x12m) by mid 2003; space should
be checked with PE in the next few months; CMM: option to move CMM to
pixel area later in 2004 kept but no move in 2003
Other open issues: TRT will dedicated local air venilation fin
clean room (see actions)