SR status (8 and 15 Nov 2002)

 

 

(Click to enlarge)

Status 8-11-02


Wall panels for clean room walls and ceiling are delivered. They will be mounted during the next 3 wks by Schultess.

img_5432

Ventilation: extraction air-ducts delivered

img_5433

Ventilation: Mono bocks airhandling unit was delivered to CERN.

img_5434
img_5435
img_5436

Doors to clean room:

Doors have been mounted by IDEA, Italy. Some correction to the doors were necessary and were carried out by IDEA. We have all doors (3 large+3small) mounted.

img_5437
img_5438
img_5439
 

Status 15-Nov-2002


Ventilation: Main electrical control cabinet mounted in SR1 building

img_5619

Ventilation: Main inlet airducts now connected through the wall towards the airhandling unit.

img_5620

Clean room:

First stretch of clean rooms walls are mounted. The diffusers are mounted and sealed in the wall.

img_5623
img_5624
img_5625
img_5626

Ventilation: Air handling unit installed on the concret slab behind the building.
The installation of the airducts to the AHU is progressing at the moment. The airhandling unit is currently being cabled by ZVVZ to the main electrical control.

img_5627
img_5628
img_5629