Minutes Meeting 19/3/03



(Click to open actions and presentations)


1.) Move to SR1
Discussed the move of SCT/PIX/TRT to SR1

SCT: see transparencies; the proposed position has to be aligned with TRT needs and building contraints (position of air-diffusers, AC outlets) and maximum cable length of SCT cables

TRT: still need more detailed inventory of equipment to be moved to SR1 soon together with a desired floor plan (see actions)

PIX: require space for the ITT (3x12m) by mid 2003; space should be checked with PE in the next few months; CMM: option to move CMM to pixel area later in 2004 kept but no move in 2003

Other open issues: TRT will dedicated local air venilation fin clean room (see actions)

Action190303
SCT190303